PHOTOS: Belgrade Airport’s central processor takes shape

NEWS FLASH


Belgrade Nikola Tesla Airport’s expansion project is continuing to advance with the most extensive work currently taking place in front of the terminal buildings. Construction of the new central processor, which stretches over 15.000 square metres and is divided into six segments is taking place, which includes the construction of a viaduct for pedestrians and cars, as well as the expansion of the smaller short-term car park which will be located in front of the terminal. The new central processor will enable the airport to boast 100 check-in desks, up to 1.200 square metres of additional retail space and an expanded arrivals area. The project will also allow for faster access and more efficient traffic flow.








Asphalt is being layered on the final segment of the airport’s new 3.500-metre-long inserted runway. Simultaneously, a new lighting system for the inserted runway, which will replace the existing one during its reconstruction, is currently taking place.




Work is continuing inside the terminal buildings as well, with gates A5 to A10 currently under reconstruction. A new floor is being added above these gates. In addition, the airport has begun opening new retail areas, with several new stores and cafes expected to open in the coming period, while the first food and beverage facility was recently launched in the newly expanded segment of the C concourse.






0 Response to "PHOTOS: Belgrade Airport’s central processor takes shape"

Post a Comment

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel