Belgrade Airport’s new control tower nears completion

NEWS FLASH


The construction of the new 75-metre control tower at Belgrade Nikola Tesla Airport is progressing on schedule with work set to be completed by the end of this quarter. The new facility, which also includes a two-level flight control centre at its base, will become operational during the first half of 2022, once all the latest equipment fitted inside the facility is tested. The project is valued at 17.5 million euros, with a further five million invested into the purchase of new equipment. The facility stretches over an area of 7.500 square metres and has a control tower cab of 120 square metres. The existing control tower at Belgrade Airport has been in use since 1962. It will be closed upon the completion of the new facility, however, it will be up to operator SMATSA (Serbia and Montenegro Air Traffic Services Agency) to decide on its fate.




0 Response to "Belgrade Airport’s new control tower nears completion"

Post a Comment

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel